Griffin installed three dewatering systems utilizing the standard jetting method that consisted of a total of 372 wellpoints approximately 6 ft. on center for the bore pits and the 20-inch pipeline. Wellpoints were also installed at 3ft on center for the two creek crossings. Two Griffin 8in wellpoint pumps were placed along the alignment at select locations.