After reviewing all possible dewatering options it was determined that wellpoint dewatering would be the most comprehensive and cost-effective solution. The system was equipped with an auto-dialer to alert all parties of a potential system interruption.
Griffin also provided dedicated backup pumps with auto-start capabilities, which would immediately start in the event of a primary pump failure. Griffin continued to work with the contractor to relocate pipe and road crossings allowing work to proceed in an uninterrupted fashion.