Furnish and Install a 260 ft. wellpoint perimeter system with two wellpoint pumps, a baffled settling tank, and a flow meter.
THE CHALLENGE
The typical scenario of layed river and or marine deposits creating interfacial conditions and SP soils capable of higher flows.
THE SOLUTION
Griffin employed wellpoints on proper centers to accomadate the flow and the required drawdown. Griffins experience to properly install the wellpoint equipment to achieve maximum performance.
GRIFFIN DIFFERENCE
Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the client.