Griffin’s operations team evaluated the site and determined the steps that were necessary to safely install the wellpoint system in the challenging environment. The contractor was on a tight schedule and leaned on the Griffin project management team for assistance in expediting the project schedule.
A 700 LF wellpoint system was installed to facilitate construction of the Process Building, Denite Filters, Headworks, and Influent Pump Station.