COLLEGE PARK, MD
Furnish and install gravel-packed wells up to 50 ft. with collector discharge distribution cable, baffled settling tank, and airflow meter.
THE CHALLENGE
Aster College Park is a new mixed-use community in Prince George’s County, MD. Difficult fine grained soils and potential refusal indicated gravel packed wells and sumping as the best methodology.
THE SOLUTION
After an onsite meeting with the client, it was determined the conditions warranted the installation of deep wells.
Owner
Buzzuto Development
Client
Buzzuto Construction
Client
Bohler Engineering
TIME
2020-2021
REVENUE
$157,500
GRIFFIN DIFFERENCE
Griffin’s relationship with client and vast experience in the area was invaluable in assisting the client in their decision.
We emphasized Griffin’s long history of successful projects. Griffin’s accumulated knowledge of soil and groundwater conditions in the metro Washington area is exceptional and assisted Griffin with designing and implementing a system that allowed the project to proceed on-time and on-budget.
READY FOR YOUR PROJECT?