Griffin provided a turn-key solution and completed all dewatering permitting, design, submittal and installation. Griffin’s eductor system designed and the difficult dewatering conditions at the site. Eductors were drilled up to 60 ft. below the surface elevation to lower groundwater to 5 ft. below the bottom of the excavation. The eductor system pumped at 65-90 gpm and dewatered the site to meet an aggressive construction schedule.