400 11TH STREET SOUTH

ARLINGTON, Virginia

We were contracted to install a gravel packed well dewatering system for the new construction of a multi-family residential building in an urban area of Arlington.

THE CHALLENGE

This is a tight site, closely surrounded by adjacent buildings and roads.    Our experience in this region also allowed us to remind Balfour Beatty of the possibility for high iron in the  groundwater. We worked with them at an adjacent site where iron and space were both issues.

THE SOLUTION

We worked closely with Balfour Beatty to help locate the wells in a layout that allowed them the most space and reduced delays. We also provided an option to proactively treat the wells for iron to reduce well production loss.

GRIFFIN DIFFERENCE

Providing these turnkey solutions was important to Balfour Beatty, along with our previous relationship working together on the adjacent site. Our flexibility to adjust our plan and our ability to anticipate potential iron issues has helped to keep this project on schedule.