Planning a Groundwater Treatment Project - Design Considerations

water treatment design system

Treatment System Design Considerations

Understanding the flow, water quality, duration, and space available is critical when designing an effective treatment system to meet water discharge quality requirements.

Flow Rate - How much water will be discharged?

Flow rate is necessary to determine media requirements and the size of the system. Flow rates are estimated during the dewatering system design process using the project and hydrogeologic information available.

Typical dewatering systems provide a constant stream of water that’s treated 24/7. However, other factors may need to be considered depending on the project. The following questions should be asked if flows are intermittent or there are other sources of water:

Intermittent Flow

Total Flow

Water Quality

Knowing water quality is necessary for determining the treatment needs. Influent water quality and effluent discharge standards dictate what contaminants need to be removed. Certain media types may require additional testing to evaluate constituents that will affect the media’s ability to effectively provide treatment.

Water quality information can be collected through the following activities:

Duration of Discharge - How long will the discharge last?

Knowing the duration of the project is required to calculate the life of media bed.

Other considerations when it comes to project duration are:

Discharge Point - Where to discharge water?

Understanding the discharge location will have a significant impact on the amount of treatment required prior to discharge. Some potential discharge locations and considerations are:

Onsite holding/Recharge features

Sanitary or Storm Sewer

Surface Water Body

Space Available On-site

Availability of space on site is crucial, and you must plan for the area to accommodate the required system. Space on-site dictates if media will be sized for the entire duration or will need to be exchanged periodically during the project.

Typically, the higher the flow rate, the larger the footprint necessary. Consideration to site logistics or the impact of the treatment system setup/weight on the excavation/shoring should be made.