-
Savage Hammond Transload Expansion
Project Name: Savage Hammond Transload Expansion Project Location: Hammond, IN Owner: Savage Services GC: Meyer Contracting Engineer: Savage Services Project Revenue: $225,000.00 Summary: The Transload facility remained in operation during installation of the jetted deep well dewatering system, required to install a water line, sewer line and retention basin during plant upgrades. Challenge: The expansion…
-
The Gerald Desmond Bridge Replacement Project
Title: The Gerald Desmond Bridge Replacement Project Location: Long Beach, CA Owner: Port of Long Beach Engineer: SFI Project Revenue: $196,450.00 Project Timeline: 2019 Challenge: The new $1.5B Gerald Desmond Bridge at the bustling Port of Long Beach is the first cable-stayed vehicular structure built in California and must conform to rigorous seismic standards. The…
-
City of Westminster – Dewatering & Water Treatment Solution for Interceptor Sewer Improvements
City of Westminster – Dewatering & Water Treatment Solution for Interceptor Sewer Improvements Owner: City of Westminster GC: Brannan Construction Co. Engineer: HDR Engineering, Inc. Project Revenue: $1,150,000.00 Project Time Period: January 2019 to November 2019 The Challenge Comprehensive upgrades to the Little Dry Creek Basin system were needed because of aging infrastructure and pressing…